SJSSAA Kapar -
Unit 5 & 6 Boiler House Lighting Works.
Saftech was awarded a sub contracting work from IHI Phase 3 to repair Boiler House
Unit 5 &6 Lighting System for SJSSAA Power Station Phase III. Works is expected
to start from November 2002 and expected to be completed in the same month.
Scope of works includes repairing/replace damage conduits, replace burnt cables,
replace fluorescent lamps fittings and insulation resistance check of electrical
circuit after rectification works have been carried out.