Slot Bunker Ultrasonic Level Transmitter in Coal Handling Plant.
Retrofitting of 20 nos. of existing ultrasonic level transmitters by
Milltronic ultrasonic level transmitters for SJSSAA Phase 2 Coal Handling
Plant. Scope of works involved dismantling of existing controllers, ultrasonic
transducers and replacing with Milltronic ultrasonic controller and
transducers in the existing control panels. Rewiring, instrument setup
(programming), calibration, testing, loop check and submission of as-built
drawings of modification were also included in the scope of works. Instrutech
Engineering supplied the new Controllers and ultrasonic transducers.
|
 |

|

|
 |
|